
24 CHAPTER 2 CONNECTING POWER AND SURGE
1 Connect the grounding wire from either the DIN rail or a GND screw terminal on the UN-
PROTECTED side of the Click 200 to the lug bolt on the inside of the pole-mount cabinet.
2 Connect another grounding wire from the exterior lug bolt to earth ground (see Figure 2.4).
Figure 2.4 – Earth Ground Connections
Installing the Power Plant
Provide power to your installation using the Click power plant. is set of modules includes
the following:
Click 201/202 AC to DC converter
Click 210 circuit breaker and switch
Click 230 AC surge module
A Click 201 provides 1 A of power and is capable of powering a single sensor, while a Click
202 provides 2 A and can power two sensors. (ere is also a Click 204 which provides 4 A
of power, but that will usually not be necessary in an installation such as the one outlined
below.) e Click 230 helps limit current surges on the power lines; the Click 210 interrupts
power during overload conditions and provides a convenient way to turn power on and o.
e power plant will either be in a pole-mount box or in a main trac cabinet. If it’s in a
trac cabinet, the power will be sent to the pole via an underground cable run. How to in-
stall the power plant and then wire to a Click 200 will be covered in the rest of this section.
It should be noted that if you have ordered a Wavetronix preassembled cabinet, all of this
wiring and installation will already be done.
Comentarios a estos manuales